Loudoun Government Center construction project complete– Sidewalk reopens, bus stop returns to original location

Construction of an awning at the Loudoun County Government Center that affected pedestrian and vehicular traffic on Harrison Street in Leesburg has been completed. As a result, on Monday, April 19:

  • The sidewalk on the Government Center side of Harrison Street between Loudoun Street and East Market Street will reopen.
  • The Loudoun County Transit bus stop on Harrison Street, which serves Routes 55 and 70, will return to its original location on the west side of Harrison Street.
  • Four public parking spaces on Harrison Street that were closed during the project will be reopened.
  • Access to the outdoor, 24-hour Treasurer’s Office depository will resume.
  • The exit from inside the Government Center to Harrison Street will reopen.

As a reminder, the main entrance to the Government Center is located on the courtyard side of the building, opposite the Government Center’s parking garage, which is accessed off Loudoun Street.

Posted in ,

Comments

Any name-calling and profanity will be taken off. The webmaster reserves the right to remove any offensive posts.